Wikipedia
{{Infobox company | name =Company Information | logo = | type = Consulting Engineering Firm | traded_as =NESPAK | predecessor = | successor = | founder = Dr. Rao Afrasiab Khan | defunct = | fate = | area_served =Worldwide
Nationwide | key_people =Muhammad Younus Dagha, Government of Pakistan
( Chairman, MoWP)
Amjad A. Khan
(President, MD)
Tahir Shamshad
( Vice-President)
Faisal Majeed
( CFO)
Board of Governors
( Ministry of Water and Power) | industry = | genre = | products = Consultancy Services | services = Project planning, Feasibility study, Detailed Design, Contract Packaging, Tender Documents, Project Management, Water Resource Planning, Dams and Barrages, Irrigation systems, Drainage, Salinity Control and Land Reclamation, Agriculture Development and Allied Fields, Socio-Economic and Impact Evaluation Studies, Groundwater Resources Development, Flood management and Forecasting/Warning Systems, Institutional and Social Development, Road Infrastructure and Master Planning, Pre-feasibility Studies for Route Selection, Soils and Materials Investigation, Geometric Design for Roads and Interchanges, Pavement design, Construction Supervision of Roads/Bridges/Tunnels, Traffic forecasting, Airports, Seaports and Harbours, Technical and Financial Evaluation, Surveys and Investigations Studies, Hydraulic Model Studies, Planning and Layout, Planning for Dredging and Reclamation Work, Harbours and Inland Waterways, Architecture and Planning, Water supply, Sewerage, Solid Waste Management, Plumbing, Industrial Wastes Treatment, Information Technology, Satellite Imagery Interpretation, Map Digitization, Digital Terrain Model, Global Positioning System Survey, GIS Database and Model Development, Geographic analysis, Map production, Software Development, Software requirements specification, Functional specifications documents, LAN/WAN administration, human resources management, Quality assurance, Building Information Modeling, | revenue = Rs 9.04 billion(2014-2015) | operating_income = | net_income = | aum = | assets = | equity = | owner = Government of Pakistan | num_employees = 5314 | parent = | divisions = | subsid = | homepage = | footnotes = | intl =Yes | caption = | foundation = | location_city = Lahore, Punjab Province | location_country = Pakistan | locations = }}
The National Engineering Services Pakistan ( reporting name: NESPAK), is a Pakistani multinational state-owned corporation which provides consulting, construction, and management services globally. It is one of the largest engineering consultant management companies in Africa and Asia. The company's headquarters' is located in Lahore with office's in Riyadh, Muscat, Tehran, Kabul, Doha and London.
As of 2016, NESPAK has been contracted to carry out 3,642 projects out of which 3,116 are domestic and 526 are overseas projects with the cumulative cost of projects at $243 billion. Among its projects include $1.65 billion Lahore Metro, $4 billion Neelum–Jhelum Project, $800 million New Islamabad Airport, $893 million expansion of Salalah Airport and the $500 million Farah River Dam Project. NESPAK is also managing the supervision of $128 million 15 small dams’ project in Western Saudi Arabia and the Obudu Dam project in Nigeria.